Case Studies From Foundation Supportworks

Case Studies: Hospital Renovation - Mount Vernon, IL

Thursday, January 26th, 2017 by Kyle Oswalt

Challenge

A second level was planned for an existing one-story building. It was determined the second story addition would overload four existing column locations. Therefore, new columns were proposed to be installed next to the existing columns to support the additional loading. The hospital had to remain operational during the entire renovation. Access and allowable working space would be limited inside the building.

Solution

Helical piles were selected to support the proposed columns given their ability to be installed within the confined space of the existing building using relatively small equipment. Model 350 (3.50-inch O.D. by 0.340-inch wall) hollow round shaft helical piles with an 8”-10”-12” triple-helix lead section were selected to support  design working loads up to 50 kips per pile. Two column locations required a pair of helical piles to support a service load of 100 kips. Four helical piles were installed at each of the remaining two column locations to support a service load of 200 kips. The project engineer also specified two additional piles be installed  near one of the new columns to provide support for contributory loads of a new wall construction. The piles were installed to achieve torque-correlated ultimate capacities of at least twice the design working loads (FOS ≥ 2). The installed helical piles were fitted with new construction caps and cast within the individual column  footings.

The helical piles were installed with a high-flow skid steer, which could be driven through standard double doors and over temporary bridging that spanned excavations within the tight working conditions. Scrubber attachments were used to mitigate exhaust fumes within the building. The helical pile installation was  completed in just two days.

Download (PDF)

Project Summary

Structural Engineer: JPS Consulting Engineers; Dickson-Schaefer

Geotechnical Engineer: Bevis Construction, Inc

Certified Pier Installer: Foundation Supportworks® by Woods

Products Installed: (14) Foundation Supportworks® HP350 Helical Piles, 8"-10"-12" Lead Section, Design Working Loads up to 50 kips (Compression)

FSI Technical Manual
Evaluation Reports
View Quarterly GroundED Newsletter
For more information about continuing education courses, contact Training@supportworks.com Sign Up to Become A Foundation Repair Dealer