April 2015 -- A new blower building was planned at a wastewater treatment facility. The area chosen for the proposed structure was previously used as a lagoon for the...
A new maintenance building was planned at an existing water treatment plant. The maintenance building would be a steel-framed structure with an approximate building footprint...
An addition with a basement level was planned for the hospital. The existing exterior foundation walls adjacent to the addition would be underpinned to prevent settlement...
The local ABC affiliate, KETV, acquired the historic Burlington Train Station to be remodeled as a broadcast and web-media facility. This remodel included the re-support...
The Cass Lake Clinic expansion consisted of an approximate 25,400 square foot addition to the existing hospital/clinic building. The project required demolition of an...
March 2011 -St. Norbert College planned a $1,175,000 addition and renovation to their existing admission center. The new addition consisted of a 60-foot diameter rotunda to...
July 2010 - The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo a 1.6 million dollar renovation to include the construction of...
September 2010 -The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay. The 120-foot by 40-foot addition was planned immediately...
June 2009- The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential cracking in the floor...
A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall sheet pile retaining wall continued to lean...
October 2012 - Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed within a stand-alone, roofless structure....
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new building and the oldbuilding...
March 2009 -- The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel framing and masonry block walls. A renovation...
November 2009 -The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis family considered purchasing the home in February...
December 2010 - An addition was planned for the existing Verizon Data Center building. The addition would be located within the paved area north, east and west of the existing...