Case Studies From Foundation Supportworks

Case Studies

A bridge was proposed to span over the Little Papillion Creek and allow pedestrian access to a new community sports arena. Temporary sheet pile walls were installed to...
An abandoned gas station built in the 1950s was being remodeled into a bakery. The general contractor found the original building construction did not include a lintel...
The Boeing Company acquired a 12,000-square-foot warehouse from Edwin Watts Golf. Boeing planned to convert the commercial distribution warehouse into a military parts...
April 2015 -- When the original, two-lane, trestle bridge experienced washout, it was replaced with multiple culverts covered with rock and soil. However, these culverts did...
A 2,800-square-foot addition was planned to extend the warehouse at four loading dock doors. The geotechnical investigation performed for the proposed addition included...
Memorial Union serves as a community center and student union building for the University of Missouri. The building’s prominent bell tower is considered by many...
April 2015 -- A new blower building was planned at a wastewater treatment facility. The area chosen for the proposed structure was previously used as a lagoon for the...
A new maintenance building was planned at an existing water treatment plant. The maintenance building would be a steel-framed structure with an approximate building footprint...
An addition with a basement level was planned for the hospital. The existing exterior foundation walls adjacent to the addition would be underpinned to prevent settlement...
The local ABC affiliate, KETV, acquired the historic Burlington Train Station to be remodeled as a broadcast and web-media facility. This remodel included the re-support...
The Cass Lake Clinic expansion consisted of an approximate 25,400 square foot addition to the existing hospital/clinic building. The project required demolition of an...
March 2011 -St. Norbert College planned a $1,175,000 addition and renovation to their existing admission center. The new addition consisted of a 60-foot diameter rotunda to...
July 2010 - The Crossing is a facility owned by The Wesley Foundation. In 2010, the building was to undergo a 1.6 million dollar renovation to include the construction of...
September 2010 -The RTD Elati Light Rail Maintenance Facility project included the construction of a new rail car wash bay. The 120-foot by 40-foot addition was planned immediately...
June 2009- The Central Decatur Community High School underwent a renovation project to repair distress in the building caused by settlement. Differential cracking in the floor...
Total Case Studies: 183

FSI Technical Manual
Evaluation Reports
For more information about continuing education courses, contact Training@supportworks.com Sign Up to Become A Foundation Repair Dealer