Case Studies From Foundation Supportworks

Case Studies

A historic home built in the early 1900’s was experiencing both lateral and vertical movement as an adjacent 17-foot tall sheet pile retaining wall continued to lean...
October 2012 - Chiller equipment was installed circa 2000 for a new middle school addition. The equipment was originally installed within a stand-alone, roofless structure....
A new single-story, slab-on-grade building was planned adjacent to the existing bank.When completed, banking operations would move to the new building and the oldbuilding...
March 2009 -- The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel framing and masonry block walls. A renovation...
November 2009 -The Davis Residence, built in 1999, is a two-story home with an unfinished walkout basement. When the Davis family considered purchasing the home in February...
December 2010 - An addition was planned for the existing Verizon Data Center building. The addition would be located within the paved area north, east and west of the existing...
December 2010 - The Boulder Rural Fire Department planned to renovate an older office building to serve as a fire station. The project included construction of a new stair...
December 2009 Shortly after construction began on a home on Big Floyd Lake, the builder began to observe early warning signs of foundation settlement. Before continuing with...
January 2009 -The Southeastern Public Service Authority (SPSA) Steam Plant is located along the Elizabeth River and adjacent to the Norfolk Naval Shipyard. The plant burns...
September 2010- The proposed site for the new Knoxville Zoo Lion and Baboon Exhibit was within a previously developed area of the property. The six test borings completed...
March 2010- In 2010, Keller, Inc. began construction of a free stall milking complex designed to handle up to 380 head of cattle at a dairy farm operation. The exterior foundation...
November 2009- Construction details for the new Culver’s restaurant included an 8-inch-thick poured concrete foundation wall, steel framing and anchored masonry veneer....
Des Peres Hospital is a 143-bed medical facility in St. Louis County, Missouri. A 13-foot tall, 12-inch thick poured concrete retaining wall provides approximately nine feet...
A new boat dock was planned along the shoreline of a small manmade lake that formed within the limits of an abandoned gravel pit. The proposed dock would extend out into the...
A beach (at grade) boardwalk was proposed at Gray’s Lake Park within the area between the Raccoon River and Gray’s Lake. The ADA compliant boardwalk would extend...
Total Case Studies: 183