APPENDIX 2F

MODEL SPECIFICATIONS

Chapter 2

Helical Foundation Systems

10.1.5 Individual anchor loading requirements (if any).

10.1.6 Manufacturer’s published allowable system capacities for the proposed anchor

assemblies, including load transfer devices.

10.1.7 Calculated mechanical and theoretical geotechnical capacity of anchors.

10.1.8 Minimum anchor termination torque requirements.

10.1.9 Maximum estimated installation torque and allowable installation torque rating of

anchor.

10.1.10 Minimum and/or maximum embedment lengths or other site specific embedment depth

requirements as may be appropriate for the site soil profiles.

10.1.11 Inclination angle and location tolerance requirements.

10.1.12 Load test procedures and failure criteria, if applicable.

10.1.13 Copies of certified calibration reports for torque measuring equipment and load test

measuring equipment to be used on the project. The calibrations shall have been

performed within one year of the proposed helical anchor installation starting date or as

recommended by the equipment manufacturer.

10.1.14 Provide proof of insurance coverage as stated in the general specifications and/or

contract.

11

PLACEMENT REQUIREMENTS

11.1 Helical anchors shall be installed within 3 inches of the indicated plan location.

11.2 Helical anchor shaft alignment shall be within 2 degrees of the inclination angle shown on the Plans.

11.3 Top elevation of helical anchors shall be within 2 inches of the design vertical elevation.

12

ANCHOR INSTALLATION

12.1 Installing Contractor shall furnish and install all helical anchors per the project Plans and

approved anchor design documentation. In the event of conflict between the project Plans

and the approved anchor design documentation, the Installing Contractor shall not begin

construction on any affected items until such conflict has been resolved.

12.2 The Installing Contractor shall conduct their construction operations in a manner to insure the

safety of persons and property in the vicinity of the work. The Installing Contractor’s personnel

shall comply with safety procedures in accordance with OSHA standards and any established

project safety plan.

12.3 The Owner shall request marking of underground utilities by an underground utility location

service as required by law, and the Installing Contractor shall avoid contact with all marked

underground facilities.

12.4 The portion of the construction site occupied by the Installing Contractor, including equipment

and material stockpiles shall be kept reasonably clean and orderly.