APPENDIX 2F

MODEL SPECIFICATIONS

Chapter 2

Helical Foundation Systems

in a manner which will allow for constructing the wall facing to the specified minimum

thickness and to the line and grade indicated on the Plans.

11.8.3 The Owner shall perform the excavation for the soil nail wall under the direction of

the Installing Contractor. Care shall be taken to excavate to the final wall face using

procedures that: (1) prevent over-excavation; (2) prevent ground loss, swelling, air

slaking, or loosening; (3) prevent loss of support for completed portions of the wall; (4)

prevent loss of soil moisture at the face; and (5) prevent ground freezing.

11.8.4 The exposed unsupported final excavation face cut height shall not exceed the vertical

nail spacing plus the required reinforcing lap or the short-term stand-up height of the

ground, whichever is less. Excavation to the next level shall not proceed until helical soil

nail installation, reinforced shotcrete or other wall or slope facing placement, attachment

of bearing plates and connection means and nail testing has been completed and

accepted in the current lift. Shotcrete shall have cured for at least 72 hours or attained

at least its specified 3-day compressive strength before excavating the next lift.

11.9 Helical Soil Nail Installation

11.9.1 Installing Contractor shall determine the installation method necessary to achieve the

helical soil nail pullout resistance specified herein or on the Plans, in accordance with

the helical soil nail acceptance criteria in the Helical Soil Nail Testing section. Install

sacrificial helical soil nails for verification testing using the same equipment, methods,

nail inclination and soil nail models as planned for the production soil nails.

11.9.2 No installation of production helical soil nails will be permitted until successful pre-

production verification testing of nails is completed and approved by the Owner. The

number and location of the verification tests will be as indicated on the Plans or specified

herein.

11.9.3 During installation of the helical soil nails, the torque required to install each soil nail

shall be monitored and recorded. The installation records shall include the following

information:

11.9.3.1 Date and time of installation

11.9.3.2 Gear motor make and model

11.9.3.3 Location of helical soil nail and nail identification number

11.9.3.4 Actual helical soil nail model and configuration

11.9.3.5 Quantity and length of lead and extension sections installed

11.9.3.6 Installation torque log taken in minimum 5-foot increments of the total soil nail

length and the final installation torque

11.9.3.7 Actual inclination of the soil nail

11.9.3.8 Comments pertaining to interruptions, obstructions, or other relevant

information