APPENDIX 3D

MODEL SPECIFICATION – HYDRAULICALLY-DRIVEN PUSH PIER SYSTEMS

Chapter 3

Hydraulically-Driven Push Piers

10

TERMINATION CRITERIA

10.1 The final drive force and any required pier length and embedment depth criteria as specified

in the Pre-Construction Submittals shall be satisfied prior to terminating the pier installation.

Push pier installation will be halted if excessive lift of the structure occurs prior to reaching

the specified final drive force or pier length/depth criteria and the Owner will be notified of this

occurrence prior to continuation of the work. The Owner shall be notified in the event any push

pier fails to meet the production quality control termination criteria as specified on the Plans.

In the event that the pier does not meet the production quality control termination criteria, the

following remedies may be appropriate if approved by the Owner:

10.1.1 If the installation fails to meet the minimum final drive force criterion at the specified

embedment length:

10.1.1.1 Continue the installation to greater depths until the minimum final drive force

criterion is met, provided that, if a maximum length constraint is applicable,

continued installation does not exceed said maximum length constraint

10.1.2 If the maximum drive force rating of the push pier system is achieved prior to satisfaction

of a minimum embedment length criterion:

10.1.2.1 Terminate the installation at the depth obtained

10.1.2.2 Pre-drill to a depth that allows termination at or below the minimum embedment

length

10.1.3 If the installation reaches a specified maximum embedment length without achieving

the minimum final termination force criterion:

10.1.3.1 De-rate the load capacity of the push pier based on the final drive force

recorded at termination depth and install additional piers as necessary.

10.1.4 If a push pier fails a production quality control criterion as described in this Section

or for any reason other than described in this Section, any proposed remedy must be

approved by the Owner prior to initiating its implementation at the project site.

11

INSTALLATION RECORD SUBMITTALS

11.1 The Installing Contractor shall provide the Owner copies of individual push pier installation

records within 24 hours after each installation is completed. Formal copies shall be submitted

within 30 day from the completion of the push pier installation. These installation records shall

include, but are not limited to, the following information:

11.1.1 Date and time of installation

11.1.2 Location of push pier and pier identification number

11.1.3 Installed push pier model and configuration

11.1.4 Total length and tip depth of installed pier

11.1.5 Actual inclination of the pier

11.1.6 Hydraulic pressure reading at the end of each tube section installed