APPENDIX 3D

MODEL SPECIFICATION – HYDRAULICALLY-DRIVEN PUSH PIER SYSTEMS

Chapter 3

Hydraulically-Driven Push Piers

12.2.5 Unique test identifier and map showing the test pier location.

12.2.6 Pier model and installation information including drive pressure/force records of each

pier tube, final drive pressure/force, drive tube quantities and lengths, final pier tip

depth, installation date, and total test pier length.

12.2.7 Calibration records for applicable pier installation and test equipment

12.2.8 Tabulated test results including cumulative pier head movement, loading increments

and hold times

12.2.9 Plots showing load versus deflection for each loading/unloading interval

13

CLEANUP

13.1 Within one week of completion of the work, the Installing Contractor shall remove any and all

material, equipment, tools, debris or other items belonging to the Installing Contractor or used

under the Installing Contractor’s direction.