

© 2014 Foundation Supportworks
®
,
Inc.
All Rights Reserved
p 339
Chapter 5
PolyLEVEL
®
Polyurethane Foam and Resin
CHAPTER 5
POLYLEVEL
®
POLYURETHANE FOAM AND RESIN
Step 3
– PolyLEVEL is injected to fill voids and
allow for lifting
(Figure 5.7.a3)
.
Step 4
– The injection ports are removed and the
holes are patched with mortar mix, polyurethane
sealant or epoxy sealant
(Figure 5.7.a4)
.
Figure 5.7.a3
Figure 5.7.a4