APPENDIX 2F

MODEL SPECIFICATIONS

Chapter 2

Helical Foundation Systems

12.1.4 If a helical pile fails to meet the acceptance criteria in a pile load test:

12.1.4.1 Install the pile to a greater depth and installation torque and re-test; provided

that, if a maximum embedment length constraint is applicable, continued

installation will not exceed said maximum length constraint, or

12.1.4.2 Replace the pile with one having more and/or larger helix plates. The

replacement pile must be embedded to a length that places the last helix plate

at equal to its own diameter beyond the depth of the first helix plate of the

replaced pile without exceeding any applicable maximum embedment length

requirements. The replacement pile must be re-tested, or,

12.1.4.3 De-rate the load capacity of the helical pile based on the results of the load

test and install additional piles. Additional piles must be installed at positions

that are at least three times the diameter of the largest helix plate away from

any other pile locations.

12.1.5 If a helical pile fails a production quality control criterion as described in this Section

or for any reason other than described in this Section, any proposed remedy must be

approved by the Owner prior to initiating its implementation at the project site.

13

INSTALLATION RECORD SUBMITTALS

13.1 The Installing Contractor shall provide the Owner copies of the individual helical pile installation

records within 24 hours after each installation is completed. Formal copies shall be submitted

within 30 days following the completion of the helical pile installation. These installation records

shall include, but are not limited to, the following information:

13.1.1 Date and time of installation

13.1.2 Location of helical pile and pile identification number

13.1.3 Installed helical pile model and configuration

13.1.4 Termination depth, pile head depth, and length of installed pile

13.1.5 Actual inclination of the pile

13.1.6 Final torsional resistance

13.1.7 Calculated geotechnical capacity based on final torsional resistance

13.1.8 Comments pertaining to interruptions, obstructions, or other relevant information