MISCELLANEOUS STRUCTURAL SUPPORT PRODUCTS

the first and second courses of block is often

obvious and measureable. In order to recover this

movement and straighten the wall, the backfill

soil must again be completely excavated down to

the footing. The base of the wall is pushed back

and Geo-Lock wall anchors are installed

(Figures

4.2.5.1.b1 and 4.2.5.1.b2)

. In circumstances such

as these, the interior wall plate of the Geo-Lock

system is often replaced with a steel channel

connected to the anchor rod and bolted to the

concrete floor

(Figure 4.2.5.1.b3)

.

Figure 4.2.5.1.b1

Before: Shear movement

of a block wall evident from exterior

Figure 4.2.5.1.b2

After: Shear movement recovered and

wall stabilized with Geo-Lock anchors

Figure 4.2.5.1.b3

Geo-Lock channel anchor

system installed to prevent shear movement