Background Image
Table of Contents Table of Contents
Previous Page  57 / 365 Next Page
Information
Show Menu
Previous Page 57 / 365 Next Page
Page Background

© 2014 Foundation Supportworks

®

,

Inc.

All Rights Reserved

p 57

Chapter 2

Helical Foundation Systems

CHAPTER 2

HELICAL FOUNDATION SYSTEMS

2.12.3.3 Helical Tiebacks

Helical tiebacks can be installed using either

machine-mounted or hand-held drive heads. Basic

installation procedures consist of the following:

• Attach lead section to product adaptor and

install hitch pin or bolt.

• Elevate lead section along with drive head

assembly and place tip of tieback at marked

location.

• Establish angle of inclination and align lead

section per design specifications.

• Provide minimal crowd to seat lead shaft tip.

• Install lead section while maintaining

installation angle.

• Connect extension section to the lead and

tighten bolted connection at coupler.

• Continue adding extensions until embedment

length and minimal torque requirements are

met.

Refer to the Model Specifications for

Helical Anchor Foundations in Appendix 2F

for termination criteria when the minimum

overall length or minimum torsional

resistance is not met.

• Remove installation equipment and install

threaded transition assembly on end of

extension. Tighten coupling bolt.

• Install threaded rod into transition so threads

are fully engaged.

• Place wall plate, bracket or waler system over

threaded rod. Place nut on threaded rod and

tighten to bearing plate.

• Tighten nut to a predetermined torque to

correlate to an axial tensile force. For larger

projects, a calibrated hydraulic cylinder may

be used to pre-tension the tieback to the

design working load or to run a load test.

• Remove equipment and cut threaded rod.