Chapter 2

Helical Foundation Systems

CHAPTER 2

HELICAL FOUNDATION SYSTEMS

not provide an accurate or reliable indication

of torque and should not be used solely as a

measure or estimate of applied torque.

Electronic torque transducers

such as the Pro-

Dig intelli-Tork

®

are placed in line with the tool

string. Torque is a true real time measurement and

is generated continually during the installation of

a helical pile or tieback. The intelli-Tork

(Figures

2.12.2.3.e1 and 2.12.2.3.e2)

measures the torque

applied between two flanges and transmits the

torque reading to a hand held unit for display

and logging. A built in torque sensor within the

housing of the flanged instrument transfers data

via blue tooth wireless technology to the PDA

system. The PDA based system and software

provide a remote visual indication of the torque

during the installation. Software provided with the

instrument has the ability to log the torque, depth

and installation angle. Torque transducers can be

re-calibrated as needed to ensure accuracy. In

turn, a properly calibrated torque transducer can

be used to calibrate analog gauge systems relative

to differential pressure.

2.12.3 Installation Guidelines

2.12.3.1 New Construction

Installing the Lead Section:

• Align the lead section with the product adaptor

and install the temporary hitch pins or bolts.

• Position the installation equipment and pile

directly over the marked location.

• Apply a small amount of crowd to seat the pile

shaft tip into the soil.

• Use a level or digital gauge to plumb or set the

installation angle (batter) of the pile shaft.

• Advance the pile in a continuous even manner,

making periodic adjustments to maintain

alignment throughout the installation. Record

torque as required by project specifications

or as dictated by changing soil conditions.

Although the final installation torque is

arguably the most critical, it is good practice

to record pressure or torque during the entire

installation. This allows for development of a

relative soil strength profile with depth. The

interval of readings is often dictated by the soil

variability; i.e., more readings should be taken

in heterogeneous soils and fewer readings are

required in uniform, homogeneous soils. At a

minimum, record torque for every lead section

and extension.

• Terminate installation of the lead section before

the product adaptor penetrates the soil.

• Remove the hitch pins or bolts and carefully

remove and raise the drive head.

Installing Extension Sections:

• Place the first extension on top of the buried

lead. Align the coupler bolt holes with the bolt

holes of the lead section. Use a spud wrench

if necessary.

• Install coupler bolts taking care not to

damage threads. Tighten nuts to snug

condition

(Figure 2.12.3.1.a)

.

Figure 2.12.2.3.e1

Electronic torque transducer

Figure 2.12.2.3.e2

Torque transducer providing direct reading of

torque for helical pile project at Reagan National Airport